General contracting and construction

the summery of project

The bridge was constructed based on studies that were prepared with the aim of developing the city’s infrastructure, as well as addressing traffic congestion that frequently occurs as a result of the location’s proximity to malls, exhibitions, and markets, in addition to the fact that it connects the most important vital areas in the city.

The project was implemented in several stages, starting with technical and engineering studies, preparing preliminary plans and sketches, in addition to studying the condition of the soil and climatic factors.

About the project

The project is considered one of the important projects in this field. The project was also completed based on the study that was prepared previously, which included studying most of the technical and engineering aspects of the project.

  •  

project name

Pit Boss Bridge

Section

Oil services

the site

Yemen - Sanaa - Beit Boss

Project challenges

The project faced many challenges that were easily overcome, which were the high costs of transportation and supply, in addition to the unavailability of petroleum derivatives and their varying prices, which caused the study to be amended several times to study the potential challenges and risks that may face the implementation of the project. Emphasis was also placed on the time plan for implementing the project with… Taking into account the climatic factors that may hinder the implementation of the project

Project mission

The project’s mission is to develop the city’s infrastructure through implementing the project with technical and engineering specifications that make the project connect the city’s most important main roads, which are the lifeline linking the city’s most important commercial and service areas.